BERNA FORNI INDUSTRIALI




Engineering and Consulting Studio for Industrial Furnaces and Heat Treatment Plants
ita1.gif
ukn1.gif













UPGRADING, SAFETY AND COMPLIANCE OF OLD PLANTS

Legislation changes require the owners of furnaces and accessories to upgrade their facilities.
Your control system may require to upgrade the plants in compliance with the CE standards.
B.F.I. offers its experience in order to study the CE compliance of old plants.

This service is composed by several phases:

  • Plants examination
    On Your request, B.F.I. will visit Your plant in order to examine the furnaces which require an upgrading and technical documentation.
  • Detailed offer and budget
    A Following this first visit, you will receive a detailed proposal with its budget. This proposal sets out two categories of operations to be made: the mandatory and recommended upgrading.
  • Appointment
    After acceptance of all or part of the budget is fixed an appointment with our technician.
  • Upgrading
    During his visit, our engineers will carry out all measurements and controls the relief in order to be able to complete the detailed documents for the equipment upgrading.
  • Report delivery
    Subsequently B.F.I. will deliver a technical report with detailed guidelines to carry out interventions for revamping the design standard or safety of your system.

After this operations the material is deemed to comply with the regulations. This performance has not an approval value.



Via Antonio Gramsci 9  -  29010 Sarmato
Piacenza  -  Italy
Mob.: +39 348 7316557
e-mail: contact[at]berna-forni.com